Commit Graph
8 Commits
Author SHA1 Message Date
chendun1995andClaude Opus 5.5 cfc9da2c87 Speed-ups (shared PVI fit, clones once, case-control sampled deferred model); final scale 200 reps extending the draft (D51)
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-27 09:31:03 -04:00
chendun1995andClaude Opus 5.5 e1457ccc1e Decisions 45-50: scenario tuning, NC truths, oracle own estimand, separate PVI phases, validation
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-27 09:20:22 -04:00
chendun1995andClaude Opus 5.5 5ae8874693 Decisions 40-44: build notes for simulator and calibration
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-27 08:15:30 -04:00
chendun1995andClaude Opus 5.5 eb886d5505 Decisions 38-39: keep the three aims
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-27 07:54:19 -04:00
chendun1995andClaude Opus 5.5 a59363a4b9 Decisions 34-37 (sharp disease null, threat strengths, NCE adjustment, sorting) applied to the analysis plan
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-27 07:01:05 -04:00
chendun1995andClaude Opus 5.5 d2d1e3a1d4 Analysis plan v1.0 (md + docx) with draft Table 1 of claudication RCTs
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-27 06:58:58 -04:00
chendun1995andClaude Opus 5.5 645713f7ec Decisions 32-33: negative controls
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-27 06:52:22 -04:00
chendun1995andClaude Opus 5.5 c3c22fdcdf Literature reviews and decisions log (rounds 1-5) for the early-PVI TTE simulation
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-27 06:51:17 -04:00